Project Area and Overview:
The work to be performed on Wye includes replacement of the water mains, improvements to the storm water management system, and repaving the roads. The work on Port Washington Road includes replacement of the water main only which is anticipated to be directionally drilled. Construction was started on July 18, 2022 and expected to be completed by the Fall.
Project Updates:
Questions regarding the project can be directed to Scott Brandmeier, Director of Public Works, at 414-351-8900 or sbrandmeier@villageoffoxpoint.com.
Our team of contractors in this project are:
American Sewer Services, Inc (ASSI) – Prime Contractor, Underground
RJ Underground – Directional Drilling
Hartford Landscape – Erosion Control
DAAR Engineering – Layout Staking
Stark Asphalt – Asphalt and Concrete